An orange diamond-shaped Road Work Ahead sign is posted on a wooden pole, with blurred buildings and trees in the background. The X101 Always Classic logo appears in the top left corner.
Local News

Micro Paving to Begin Thursday on Several City Streets in Cortland



Beginning on Thursday, May 8th, Suit-Kote will begin to micro pave several streets within the City of Cortland. According to Crown City Rising, work will last approximately a week, weather permitting. 

Micro paving is a pavement preservation treatment. The process involves applying a thin layer of a specialized mixture to an existing asphalt surface. According to Suit-Kote, this process is a cost-effective and long-lasting remedy for worn or high volume streets/roadways. 

Streets to have micro paving are:

  • Greenbush Street
  • Hollenbeck Street
  • Venette Street
  • Charles Street
  • Madison Street
  • Pomeroy Street
  • James Street
  • Macgregor Street
  • Lebanon Drive
  • Helen Ave.
  • Miller Street

Motorists are asked to find an alternate route for busier streets. Those include Madison, Pomeroy, and Greenbush Streets. Updates may be found at CrownCityRising.com.



On Air Now

  • Thursday, 9:30 pm - 11:59 pm
    [ - ]

Download The X101 App


Site Designed & Hosted by Eves Digital