An orange diamond-shaped Road Work Ahead sign is posted on a wooden pole, with blurred buildings and trees in the background. The X101 Always Classic logo appears in the top left corner.
Local News

Informational Meeting Taking Place Tonight at Parker School For Culvert Replacement on Maple Ave.



Happening this evening from 7pm to 9pm, will be an informational meeting regarding an upcoming culvert replacement project on Maple Ave. for Otter Creek in the City of Cortland. The meeting will take place at Parker School at 89 Madison Street in Cortland. Residents are asked to enter through the side entrance to the building.

At the information meeting will be representatives from the city and the project design team to explain the project in detail and be able to answer any questions residents may have. Questions may also be directed to Superintendent of Public Works for the City of Cortland, Michael Wiese via email, MWiese@Cortland.org.

The upcoming project will be reimbursed through Bridge NY funding. Mayor Steve added this project will not see the significant traffic disruptions that work on Groton Ave, and Main Street saw during construction.



On Air Now

Download The X101 App


Site Designed & Hosted by Eves Digital