A small excavator is parked on a city street near a Groton Ave street sign. Theres a Always Classic X101 logo in the top left corner and some houses in the background.
Local News

Final Paving For Groton Ave. Set For Wednesday – Side Streets to be Paved Today



The final paving for Groton Ave. in the City of Cortland is scheduled for Wednesday, July 9th. Happening today, Tuesday, final paving will take place on side streets that connect to Groton Ave, Crown City Rising says.

Side streets to be paved today include Monroe Heights, Homer Ave., Pleasant Street, Stevenson Street, and Graham Ave.

Motorists are being advised during the final paving process, Groton Ave. will be reduced to one lane traffic with alternating lane closures. Crown City Rising is encouraging motorists to utilize an alternate route and avoid the area around Groton Ave.

Updates may be found at CrownCityRising.com. 



On Air Now

Download The X101 App


Site Designed & Hosted by Eves Digital